To progress the redevelopment of the Hamilton CBD, detailed designs and drawings are required to provide a robust costing to inform future investment by Council and avoid any missteps in the project implementation.
The documentation should include:
• Detailed feature survey and onsite measurements, geotechnical investigations, hydrological investigations, location of underground services and any sampling and testing required to develop suitable plans, designs and drawings.
• Detailed engineering design of the project, including detailed geometric design, pavement design, street scape design, parking design and street light design.
• Detailed design of underground stormwater drainage and shared path in the project area.
• Detailed design of traffic control devices, signage and line marking.
• Detailed design of roadside furniture, roadside environment and public open spaces.